DOĞRU MÜHENDİSLİK is an independent engineering firm with 29 years of experience in transportation, urban infrastructure, structures, energy, and water resources projects, delivering safe, economical, and sustainable engineering solutions through an interdisciplinary approach and a boutique service mindset.
The Kalecik Hydroelectric Power Plant (HPP) Project is located in the Central Anatolia Region, within the boundaries of Ankara Province, on the Kızılırmak River. The water source of Kalecik HPP is the Kızılırmak River, and the project is located downstream of the Kapulukaya Dam. The flows reaching the Kalecik HPP Project are regulated by the Kapulukaya Dam.
The structures included in the project consist of the following components:
| Design Discharge | 100 m3/s |
|---|---|
| Number of Units | 2 units |
| Turbine Type | Bulb Turbine |
| Regulator Type | Radial Gate |
| Number of Gates | 10 units |
© 1986-2026 Doğru Engineering | All rights reserved.
Developed by: Idesa Creative